AVA Environmental Consultants, Inc. Compliance · Sustainability · Engineering
Project sheet
Resilient hospitals: environmental reviews for six campuses
Environmental screenings, determinations and review records that let six hospital campuses add redundancy with CDBG-MIT funds.
Client
Doctors’ Center Hospital · Hospital General Castañer · Metro Pavía Health System
Program
CDBG-MIT Infrastructure Mitigation Program – Healthcare (PRDOH)
Period
September 2025 to present
Our role
Environmental screening, level-of-review determinations and Environmental Review Records
Project6hospital campuses
An emergency generator at Hospital General de Castañer in Jayuya, during our visit in August 2026.
6hospital campuses
2level-of-review determinations signed in September 2025
CDBG-MITInfrastructure Mitigation Program – Healthcare
The challenge
After the hurricanes and the earthquakes, Puerto Rico’s hospitals are adding redundancy — chillers and HVAC, water wells, fuel tanks and generators, cogeneration, roofs, fire suppression and expanded emergency rooms. Each federally funded project needs its environmental screening or review before work starts, on campuses that never close.
What we did
For Doctors’ Center Hospital in Bayamón and Dorado, Hospital General de Castañer in Jayuya, and Metro Pavía Health System’s Metro Caguas, Cabo Rojo and Dr. Susoni hospitals, AVA prepares the environmental screenings, the Level of Environmental Review Determination and the Environmental Review Records.
Fuel tanks and generators bring explosive and flammable hazard questions, wells and roofs bring floodplain and historic-preservation questions, and every site gets a contamination screening. We schedule the site visits around hospital operations and keep each campus’s evidence in one project record.
Results
In September 2025 the level-of-review determinations for two projects at Doctors’ Center Hospital in Bayamón were signed. The reviews for the other campuses are in preparation or in consultation.
The explosive and flammable hazard survey for seven projects in one shared record — field capture, HUD’s official calculator for 139 tanks, and a rule change that caught a compliance error.