Río de la Plata flood control: environmental compliance since 2019
Permits, the erosion-control plan and a compliance inspection every month since July 2019 at the Río de la Plata flood-control works.
SWPPP · SPCC · TITLE V
The permits and plans that keep a site legal from the first excavation to operation.
Silt fence · Río de la Plata
We prepare environmental permits before Puerto Rico and federal agencies and the plans a contractor or a facility works under.
At the Río de la Plata flood-control works we obtained the consolidated general permit, its renewal and its amendments, wrote the erosion-control plan and the SWPPP, and have filed the monthly inspection reports since July 2019. For Metro Pavía Health System we keep a hospital’s Title V air-permit compliance: monthly and annual reports, emission-source permits and the SPCC plan.
EPA NPDES construction permits under the Construction General Permit, with Stormwater Pollution Prevention Plans and best-management-practice inspections.
Spill Prevention, Control and Countermeasure plans, generator and tank licensing, used-oil compliance and visible-emissions requirements.
USACE nationwide permits and DNER authorizations where projects touch wetlands or waters.
For facilities with boilers, generators and other emission sources we prepare the permit applications and renewals and keep the periodic compliance reports.
Permits, the erosion-control plan and a compliance inspection every month since July 2019 at the Río de la Plata flood-control works.
Ready to work with us? Let’s talk.
Tell us about the site, the funding program and the deadline. The principals answer, in Spanish or English.
San Juan, Puerto Rico · Est. 2009