Río de la Plata flood control: environmental compliance since 2019
Permits, the erosion-control plan and a compliance inspection every month since July 2019 at the Río de la Plata flood-control works.
AVA Environmental Consultants, Inc. — San Juan, Puerto Rico
An environmental and engineering consulting firm in San Juan since 2009. We prepare the environmental reviews, permits and studies a project needs and verify green buildings; our sister firm, FERPO Consulting, inspects and manages the construction.





San Juan, Puerto Rico · Est. 2009
AVA Environmental Consultants, Inc. is an environmental and engineering consulting firm incorporated in San Juan, Puerto Rico, in 2009.
We prepare environmental reviews, permits and studies, and we verify green buildings through our AVA Green division. Our sister firm, FERPO Consulting, P.S.C., inspects and manages construction and helps agencies keep federal funds in compliance. Two companies, the same principals, one team.
AVA prepares the environmental review and the permits; FERPO Consulting inspects and manages the construction that follows.
Our principals have worked with OGPe, DNER, SHPO and ICP, and with HUD, FEMA, USFWS and USACE, since 2004.
Professional engineers, CPAs and biologists on staff, NGBS Green Verifiers, and an SOI-qualified archaeologist and architectural historian as associates.
They do the work and answer the phone, in Spanish or English.
Field visit · AibonitoHUD Part 58 environmental review records, NEPA and FEMA environmental and historic preservation support, and Section 106 consultations.
AVA Environmental Consultants SWPPP · SPCC · TITLE VDNER and EPA permits, USACE nationwide permits, SWPPP and SPCC plans, tank and generator licensing.
AVA Environmental Consultants ESA · ASD · EDRPhase I ESAs, desktop constraints analyses, contamination reports and explosive and flammable hazard surveys.
AVA Environmental Consultants FLORA · FAUNA · WETLANDSFlora and fauna surveys, wetland delineation and mitigation, habitat restoration, tree inventories and vegetation management.
AVA Environmental Consultants LEED · NGBSLEED consulting and verification, NGBS ICC 700 Green Verifier services and Puerto Rico’s Green Permit.
AVA Green GIS · LiDAR · KMZVerified site boundaries, a local library of Puerto Rico’s government map layers, LiDAR terrain analysis and exhibit-ready maps.
AVA Environmental Consultants CIM · QA/QCResident inspection, payment certification, change orders, submittals and close-out, by FERPO Consulting.
FERPO Consulting, P.S.C. 2 CFR 200 · SEFASingle Audit evaluations, audit readiness, financial reporting and procedures, by FERPO Consulting.
FERPO Consulting, P.S.C.What the firm has done, in figures a reviewer can check. Each line links to a project sheet or to the service behind it.
Environmental reviews under 24 CFR Part 58 for CDBG-DR and CDBG-MIT projects, completed or under way as of October 2026.
Municipalities whose centers we are reviewing under the CDBG-DR City Revitalization Program, from Loíza to Lajas.
Resilience projects reviewed for Doctors’ Center Hospital, Hospital General Castañer and Metro Pavía Health System.
Permits, the erosion-control plan and a compliance inspection every month since July 2019.
Environmental consulting agreement with Puerto Rico’s electric grid operator, in force since June 2022 and extended through June 2027.
The LEED-certified PREPA Networks building received the Outstanding Environmental Engineering Project award of Puerto Rico’s College of Engineers and Surveyors.
Our work on record, municipality by municipality. Point at a sector to see where it took us, or at a dot to see what we did there.
The map is drawn from the municipal boundaries in our own geodata library, the same data behind every exhibit we deliver.
153 tanks, 7 projects, 139 official HUD calculations — how AVA moved the 24 CFR 51 Subpart C tank survey from paper to a single record, and the compliance error the new rule caught.
Every distance in an environmental review starts from the site boundary. We found a drawing 8.5 m off and a cadastral parcel 16 m out of place — here is how we verify boundaries now.
Puerto Rico’s northern karst hides sinkholes under vegetation. A 1-meter LiDAR terrain model mapped 295 closed depressions on a 241-acre site in 80 seconds of processing.