One boundary, many tools
AVA keeps one registry of project sites — the Site, the Off-Site areas (access roads, utility corridors) and a Site Point — and every tool reads it: map exhibits, screenings, the tank survey, field apps. That makes the first boundary the most important map of the project.
Three sources, three ways to be wrong
- The cadastre (CRIM) is convenient and often approximate. On one lot, the record survey showed the cadastral parcel up to 16 m out of place on one side.
- CAD drawings carry their own grid. One project drawing had been placed ignoring an 8.5° rotation of that grid, putting the site about 8.5 m off. Refitted to the drawing’s own coordinate grid, it now lands within 0.53 m (median) — and a check against LiDAR elevations at 2,269 survey spots agrees to the centimeter in the median.
- Scanned survey plats have no text layer. An AI agent reads the plat’s survey-data table from the image; then code verifies the traverse — on one lot it closed within ±4 mm — before anything is mapped.
The rule
The record survey governs over the cadastre. A new geometry version is saved beside the old one and only becomes the project’s main boundary when a person says so. AI can read the table; it never decides where the line goes.