153 tanks, seven projects, one record
The explosive and flammable hazard survey for seven projects in one shared record — field capture, HUD’s official calculator for 139 tanks, and a rule change that caught a compliance error.
FIELD · MAPS · RECORDS
Our tools keep one accurate record per project. People make the determinations.
Site visit · Toa Baja
Since 2025 we have built our own tools for the repetitive parts of environmental work. Site visits are recorded on the phone: photos with their position, and tank measurements typed once. Every map and exhibit is drawn from one verified site boundary. Reviewer comments are pulled from the marked-up PDF into a checklist, so each one gets an answer. A status board shows every study, consultation and deliverable of every project.
Software and AI models gather, search and draft. Calculations stay in code and in the agencies’ own calculators, such as HUD’s separation-distance tool. A licensed professional reviews and signs every determination, and what we could not verify is written as not verified.
Site visits leave dated, located photographs, measurements and checklists. Read how we survey tanks.
The site boundary is verified once, from the survey, the drawing or the cadastre, and every exhibit uses it. Read how we verify a site boundary.
Every reviewer comment becomes a checklist line that stays open until it is answered. Read how we answer reviewer comments.
The explosive and flammable hazard survey for seven projects in one shared record — field capture, HUD’s official calculator for 139 tanks, and a rule change that caught a compliance error.
Photos indexed, tanks calculated, maps drawn, comments tracked — a snapshot of what AVA’s digital platform has done, counted straight from its databases.
How AVA indexed every project photo with a vision model and OCR on its own server — and what that changed for the contamination report’s photo log.
153 tanks, 7 projects, 139 official HUD calculations — how AVA moved the 24 CFR 51 Subpart C tank survey from paper to a single record, and the compliance error the new rule caught.
Ready to work with us? Let’s talk.
Tell us about the site, the funding program and the deadline. The principals answer, in Spanish or English.
San Juan, Puerto Rico · Est. 2009